UEI: CYU2FMJ3JM58 • CAGE: 46Y71 • GSA Schedule: GS-07F-0222X
DLA-TLS active • $50M Bonding • SBA Small Business status

UEI: CYU2FMJ3JM58 • CAGE: 46Y71 • GSA Schedule: GS-07F-0222X • DLA-TLS active • $50M Bonding • SBA Small Business status

Twenty Years of Federal Modular Delivery — Designed by MMG. Built by MMG. Maintained by MMG.

Custom design-build modular facilities delivered on schedule and serviced long-term, organized by the agency the procurement officer represents. A USACE contracting officer sees USACE work first. A VA buyer sees VA work first. Lease projects and purchase projects both filterable. No generic galleries.

By the Numbers

0
years of federal modular delivery
0
industries served (Federal · Aerospace · Commercial · Healthcare · Education)
0
NAICS codes covered
0M
single / aggregate bonding capacity

Filter by Agency

Filter chips update the grid instantly. Procurement officers see their own agency’s work first. Secondary filters allow buyers to narrow by year, building type, size, and lease vs. purchase — because federal buyers shop the lease record differently than the purchase record.

Edwards AFB Secured Modular Facility 

Agency: U.S. Air Force Contract Vehicle: Purchase (DLA-TLS) Scope: ICD 705 Secure Modular Facility Size: 3,150 SF Year: 2019 Type: Permanent Outcome: Delivered in five months, June to October 2019. Facility accredited through the customer AO. Design, manufacture and install a 3,150 SQFT secure modular building to serve as office space. The project included supplying the furniture. The facility is designed to meet ICD 705 standards. Complete with canopies, steps and ramps, this modular facility meets ADA requirements.

F-35 Hangar 

Agency: U.S. Navy (NAS Lemoore) Contract Vehicle: Purchase (Subcontract) Scope: Temporary Modular Buildings Size: 19,448 SF Year: 2017 Type: Relocatable Outcome: Two temporary buildings (353A and 353B) delivered in five months, March to August 2017. ADA compliant throughout. Design, manufacture and install temporary buildings 353A and 353B totaling 19,448 SQFT. The scope of work included design, engineering, site development, electrical system, fire alarm, smoke and heat detection, lighting, fire sprinklers, HVAC and plumbing. The buildings included ramps, stairs, handrails, transitions, lift, and all the interior fixtures and finishes were ADA compliant.

Invisible Wounds Center 

Agency: U.S. Air Force Contract Vehicle: Purchase (Subcontract) Scope: Medical Treatment Facility Size: 18,348 SF Year: 2018 Type: Permanent Outcome: 18,348 SF medical treatment facility delivered in 11 months, September 2017 to August 2018. Design, manufacture and install an 18,348 SQFT World-Class Medical Treatment Facility at Eglin AFB. The facility includes a waiting/lobby area, behavioral health data portal kiosk, patient check-in, offices, conference rooms, screening rooms, exam rooms, treatment rooms, a medication room, therapy rooms, exercise area, bathrooms/showers/locker rooms, demonstration kitchen, dayroom, copy/office/supply room, staff lounge area, clean/soiled utility rooms, comm rooms, electrical rooms, and storage.

Kirtland AFB Secure Modular Facility 

Agency: U.S. Space Force Contract Vehicle: Lease (GSA Schedule, Base + 4-year Options) Scope: Secure Modular Facility Size: 19,978 SF Year: 2021 Type: Relocatable Outcome: Installed in just over 13 months, August 2020 to September 2021. Accredited through the customer AO. Leased and maintained by MMG. Modular Management Group was responsible to design, manufacture, install, lease, and provide the furniture and maintenance for a secure modular facility totaling 19,978 SQFT for the United States Space Force at Kirtland AFB, NM. The floorplan includes a naturally lit vestibule, waiting area, corridors, multiple offices, open floor office areas, small to large conference rooms, team rooms, IT offices, IT storage, IT lab, comm room, men's and women's restrooms and showers, locker area, wellness room, janitor room, electrical room, and a riser room. The scope of work includes a grade beam foundation, underground utilities, electrical, fire alarm and mass notification, fire sprinkler, lightning protection, data/comm, PA system, access control, intrusion detection and CCTV. MMG also provided furniture throughout the facility. The facility is equipped with steps, ramps and canopies and is ADA compliant.

Lease of Modular Dormitories 

Agency: U.S. Air Force (Goodfellow AFB) Contract Vehicle: Lease (GSA Schedule, Base + 4-year Options) Scope: Modular Dormitories Size: 37,048 SF Year: 2021 Type: Relocatable Outcome: 20 buildings housing up to 300 personnel delivered in eight months, August 2020 to April 2021. Leased and maintained by MMG. Modular Management Group was responsible to deliver, install, lease, and provide the maintenance for 20 temporary modular dorm buildings totaling 37,048 SQFT at Goodfellow AFB. The Large Modular Dormitories include five buildings with 16 rooms each, 80 rooms total, for a full capacity of 160 people. The Small Modular Dormitories include fourteen buildings with five rooms each, 70 rooms total, for a full capacity of 140 people. Every room includes built-in furniture, a television, microwave, small refrigerator, and a bathroom. The project also includes one Administration Building with a kitchen area, reception area, offices, meeting rooms and a laundry facility with 18 dryers and 21 washers (commercial grade). All buildings include a fire alarm and fire sprinkler. MMG installed 10 ft wide wood decking to connect all the buildings (approximately 16,000 SQFT of pressure treated wood decking).

Test Pilot School

Agency: U.S. Space Force Contract Vehicle: Purchase (DLA contract vehicle) Scope: Modular Test Pilot School Size: 9,240 SF Year: 2022 Outcome: Delivered in nine months, October 2021 to July 2022, with the facade matched to the existing USAF Test Pilot School. Modular Management Group was responsible to design, manufacture, install, and provide the furniture and maintenance for a 9,240 SQFT modular Test Pilot School for the Space Force at Edwards AFB, CA. The new modular facility is an addition to an existing USAF Test Pilot School and was designed to connect seamlessly with the existing structure by matching the facade with stucco and other structural and technological details. The floorplan includes a naturally lit vestibule, waiting area, corridors, multiple offices, open floor office areas, small to large conference rooms, team rooms, IT offices, IT storage, IT lab, comm room, men's and women's restrooms and showers, locker area, wellness room, janitor room, electrical room, and a riser room. The scope of work includes a grade beam foundation, underground utilities, electrical, fire alarm and mass notification, fire sprinkler, and data comm. MMG also provided furniture throughout the facility. The facility is equipped with steps, ramps and canopies and is ADA compliant.

University of Florida Modular Program Area 

Agency: DoD-Affiliated Research Contract Vehicle: Subcontract Scope: Modular Program Area Size: 6,000 SF Year: 2021 Type: Permanent Outcome: 6,000 SF program area delivered in under seven months, October 2020 to April 2021. Modular Management Group, Inc. performed this project as a subcontractor. MMG designed, manufactured, and installed a 6,000 SQFT modular facility on a concrete stem wall foundation at finish grade. Scope of work includes a single point of connection for electric, conduits at walls for data and comm, end mount HVAC for the offices and conference rooms, mini split for the server room, VCG walls, VCT or carpet tile floors, stand-alone fire system, ESD flooring in comm rooms, 6x6 aluminum canopy and posts, rain gutters, and furniture except in the conference rooms. The floorplan includes a vestibule, man trap, open office area for cubicles, break area, fire riser, electrical room, women's and men's restrooms, offices, two conference rooms, two comm rooms, and a security closet.

VAMC San Francisco Modular Office Lease 

Agency: Department of Veterans Affairs Contract Vehicle: Lease (Subcontract, Base + 4-year Options) Scope: Modular Office / Swing Space Size: 10,020 SF Year: 2023 Type: Relocatable Outcome: 10,020 SF swing space installed in under four months to keep clinical and administrative functions running during the Building 8 seismic retrofit. Lease and maintenance ongoing. Modular Management Group, Inc. performed as a subcontractor to Integrated Modular Solutions, Inc. MMG designed, manufactured, delivered, and installed a 10,020 SQFT modular facility to serve as a swing space for VAMC San Francisco. Additionally, MMG is leasing and providing the maintenance of the facility. The lease includes a Base Year + 4-Year Options. The modular facility accommodates administrative and clinical care functions impacted by the Building 8 seismic retrofit construction project. Additional scope of work includes foundation design, fire sprinkler, fire alarm, electrical, aluminum gutters and downspouts, and systems furniture.

Classified and Restricted Work

A meaningful share of MMG’s federal work is not publicly listed — classified, restricted, or under NDA. The cards above are the public set. Procurement officers may request a private portfolio briefing under NDA for additional detail. CPARS records available on request for active contracts. The lease projects above demonstrate MMG’s long-term coverage; the purchase projects demonstrate MMG’s permanent-construction record.

Past Performance Questions

How Buyers Verify MMG’s Performance

Questions about CPARS access, NDA briefings, on-time delivery proof, warranty performance, and how lease projects vs. purchase projects are evaluated live on the central FAQ page on Insights.

Use this performance record on your next solicitation — lease or purchase.

Phone: 817.740.9767  ·  Verification line for federal buyers.